MINE INSTALLATION, TANZANIA
CATA MINE INSTALLATION, TANZANIA – Full processing plant Installation and Coded Welding:
- Home
- Lq-project
- Gold Mine Installation in Tanzania
About Project
CATA Mine Installation, Tanzania
Full processing plant installation and coded welding.
ZIMPHOS, Zimbabwe
Chimney stack inspection, thickness testing, painting, and remedial works at a height of 65 metres.
Included wire rope inspection and greasing.
184-Tonne Transformer, Zimbabwe
Transport, jack-and-slide rigging.
